A standardized, data-backed 10-step verification framework for evaluating B2B manufacturing quotes before releasing deposits.
Complete each verification step below. Do not wire a deposit or sign a contract if any of these steps are marked "Incomplete" or "Failed".
Do not compare EXW or CIF directly. Add estimated inland freight/customs ($300-$600 per container) to EXW, or isolate shipping margins from CIF to establish a true FOB benchmark.
Verify that every factory is quoting the exact same alloy grade (e.g., 6063-T5), profile wall thickness, glass specs (e.g., double low-E vs single), and thermal break materials (e.g., PA66GF25).
Reject single lump-sum quotes (e.g., "$90/sqm all-in"). Require breakdowns showing raw profile cost, glass, hardware, packaging, and factory assembly.
Identify MOQ limitations. Verify if a small order triggers "less-than-container" loading surcharges, customization penalties, or higher unit rates.
Get written guarantees for custom profile extrusion die costs ($300-$3,000). Confirm if tooling fees are refundable after reaching a specific order volume threshold.
Standard is 30% deposit, 70% against pre-shipment inspection. Avoid suppliers demanding 50%+ deposits upfront. Budget for local bank currency spreads (0.5% - 2%).
Ensure certifications are mentioned in the quotation scope. (e.g., SASO SABER for Saudi, CE for EU, AS2047 for Australia). Verify test lab validity.
Verify company on the SAMR National Registry. Ensure manufacturing scope (制造/加工) is listed. Confirm physical address matches their industrial zone.
Model all destination surcharges: duties (5% GCC, Section 301 US), terminal port handling, VAT, inland trucking, and custom clearance overheads.
Embed a clause: "Balance payment released ONLY after successful 3rd party quality inspection (SGS/QIMA) and defect rate under 1.5%."
Fill out this structured evaluation sheet to easily visualize and analyze quote variations between your 3 shortlisted manufacturers.
| Field / Parameter | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| 1. Company Registered Name | |||
| 2. Manufacturing Location | |||
| 3. Verified Entity Status | |||
| 4. Product Specifications | |||
| 5. Profile Alloy & Thickness | |||
| 6. Glazing Specification | |||
| 7. Thermal Break Material | |||
| 8. FOB Unit Price (Per m²) | |||
| 9. Minimum Order Quantity | |||
| 10. Tooling & Mold Cost | |||
| 11. Sample Unit Cost | |||
| 12. Payment Milestone Terms | |||
| 13. Quoted Production Time | |||
| 14. Export Packaging Scope | |||
| 15. Certificates held | |||
| 16. On-Site Inspection Rights | |||
| 17. Business License Status | |||
| 18. Quote Validity Expiry |
Factory gate only. You bear all local Chinese trucking and export clearance fees.
Supplier covers trucking to China port and export customs. The gold comparison standard.
Often bundles high carrier margins. Isolate product cost from shipping before deciding.
1. Fill in the top metadata fields (Project, Importer, Dates) and use the interactive table directly on this page if you want digital inputs.
2. Click the "Print / Save as PDF" button at the top.
3. In your browser's print dialog, select "Save as PDF" as the destination.
4. Crucial: Enable "Background graphics" in your print settings to preserve the dark blue background color and styling.